What surface dressing is and how we complete it

Surface dressing is a quick process and usually only takes a few hours to complete, meaning we can sometimes treat several roads in one day. A sweeper will travel along the newly treated roads the following day to clear any immediate loose stones.

We usually treat roads during the summer because surface dressing can only be carried out when the road is dry. If it rains, the work has to stop and the whole programme of work is affected. If there are any changes to the programme, we will update the on-site yellow information signage with the new date.

If you have surface dressing taking place in your area we have advice on what to do before and during the works and also advice to motorists for when the road reopens.

Surface dressing process

Step 1

Workers in orange high vis spreading bitumen on the road from a lorry

  • A film of hot bitumen is sprayed onto the road

Step 2

A worker in orange high vis next to a lorry spreading chippings on the road

  • A spreader lays hard stone chippings onto the bitumen

Step 3

A roller flattening chippings on the road

  • Chippings are rolled and pressed to form an interlocking surface
  • Loose chippings are swept away within 48 hours and again within 7 days.
  • Road markings are then replaced.

 

Advice on what to do before and during the works

  • Ensure vehicles are removed from the road between 7am - 7pm. If you're going away, please make arrangements for your vehicle to be away from the road during the works
  • Check information for any disruption to bus services. Please note: we will attempt to minimise any disruption during the works where practicable
  • Do not walk or drive on the wet bitumen surface, as this may mark your shoes, car, and driveways. If walking across the freshly laid finished road surface please be aware it may stick to your shoes
  • Check your shoes and your pet's feet before entering any premises as we cannot accept liability for any damage caused.

Advice to motorists for when the road reopens

The new surface is ready to use straight after application but will take a few days to settle down.

Please drive carefully over the new surface to prevent any potential damage to vehicles. Also ensure that you take extra care when works are taking place to protect the safety of the workforce:

  • Follow the temporary speed limit in place
  • Keep your distance
  • Do not overtake.