| General information | |
|---|---|
| Number | P220884/F |
| Current status | Determination Made |
| Decision | Withdrawn |
| Appeal decision | |
| Type | Planning Permission |
| Location | Keltruck Limited, Unit 15 Thorn Business Park Rotherwas Hereford Herefordshire HR2 6JT |
| Proposal | Proposed extension to existing service workshop to create one additional service bay. alterations to existing empty workshop to create an internal HGV wash and valet facility, construction of a two storey office and welfare facility in the space between the two existing buildings all to replace the temporary portable cabin office and welfare facility. |
| Parish | Lower Bullingham |
| Ward | Dinedor Hill |
| Easting/Northing | 352493 - 238487 |
| Applicant address | Keltruck Ltd Kenrick Way West Bromwich West Midlands Ludlow B71 4JW |
| Publicity date | Wednesday 20 April 2022 |
| Comments by | Friday 20 May 2022 |
| Application dates | |
|---|---|
| Date received | Monday 14 March 2022 |
| Date validated | Thursday 14 April 2022 |
| Consultation start date | Wednesday 20 April 2022 |
| Consultation end date | Friday 20 May 2022 |
| Decision date | Friday 10 June 2022 |
| Target determination date | Thursday 14 July 2022 |
| Consultees | |
|---|---|
| Consultee | |
| Organisation name | Balfour Beatty Living Places |
| Address | Unit 3 Thorn Business Park Rotherwas Hereford HR2 6JT |
| Date consulted | 20 April 2022 |
| Consultee | |
| Organisation name | Environment Agency |
| Address | Hafren House Welshpool Road Shelton Shrewsbury SY3 8BB |
| Date consulted | 20 April 2022 |
| Consultee | |
| Organisation name | Operations Delivery |
| Address | Consultations Team (Natural England) County Hall Spetchley Road Worcester WR5 2NP |
| Date consulted | 20 April 2022 |
| Consultee | |
| Organisation name | Environmental Health |
| Address | 8 Herefordshire Council St Owen Street Hereford Herefordshire HR1 2PJ |
| Date consulted | 20 April 2022 |
| Consultee | |
| Organisation name | Dwr Cymru Welsh Water - Developer Services |
| Address | P.O. Box 3146 Linea Fortran Road Cardiff CF30 0EH |
| Date consulted | 20 April 2022 |
| Consultee | |
| Organisation name | Economic Development Unit |
| Address | Plough Lane PO Box 4 Hereford HR4 0XH |
| Date consulted | 20 April 2022 |
| Consultee | |
| Organisation name | |
| Address | Herefordshire Council Plough Lane Hereford Herefordshire HR4 0LE |
| Date consulted | 20 April 2022 |
| Consultee | |
| Organisation name | Built and Natural Environment |
| Address | Herefordshire Council Plough Lane Hereford HR4 0LE |
| Date consulted | 20 April 2022 |
| Consultee | |
| Organisation name | Transport and Access Services |
| Address | Herefordshire Council H37 Plough Lane Hereford HR4 0LE |
| Date consulted | 20 April 2022 |
| Consultee | |
| Organisation name | Lower Bullingham PC |
| Address | Hackford House Dinedor Hereford HR2 6PD |
| Date consulted | 20 April 2022 |
| Consultee | |
| Organisation name | Dinedor Hill |
| Address | 18 Wyelands Holme Lacy Hereford HR2 6LT |
| Date consulted | 20 April 2022 |
Relevant documents
Application Form (1)
- R Application Form 327KB
Decisions (1)
- Decision Notice 16KB
Supporting Documents (8)
- R Contract Preamble and Specification to go with D&A 19.6MB
- Design & Access Statement 933KB
- Flood Risk Assessment & Drainage Strategy 5.7MB
- First Floor Structural Steel 484KB
- Structural Steel Details Section Details 943KB
- Structural Steel Column Details 3 of 3 622KB
- Structural Steel Column Details 2 of 3 714KB
- Structural Steel Column Details 1 of 3 659KB
Drawings (21)
- Proposed Eaves External Gutter Detail 599KB
- ATC.1005.17a Proposed Typical Section 3.1MB
- First Floor Plan showing Structural Steel Portal Frame and Portal Rafter Layout 488KB
- First Floor Showing Precast Concrete Floor Layout 487KB
- Proposed First Floor showing Structural Steelwork 1.0MB
- Proposed Ground Floor Plan 1.4MB
- Proposed Ground Floor Layout 919KB
- Ground Floor Plan showing Foundation Layout 1.0MB
- Proposed Front Elevations 1.2MB
- Proposed First Floor Plan 1.1MB
- Proposed Ground Floor Plan 1.3MB
- Existing Block Plan 1.0MB
- Location Plan with Red Outline 801KB
- Proposed Block Plan 1.3MB
- Proposed Wash Pit Details 1.8MB
- Ground Floor Plan pending Drainage 947KB
- Proposed Foundation Detail 2 820KB
- Proposed Foundation Detail 861KB
- Proposed Ridge Detail 577KB
- Proposed Eaves Parapet Details 609KB
- Existing Floor Plans and Elevations 530KB
Representations (8)
- EHO (Contaminated Land) Comments June 2022 211KB
- Ecology Comments May 2022 47KB
- Drainage May 2022 489KB
- Welsh Water comment 2.7MB
- Parish Council Comments 200KB
- Network Rail comment 336KB
- landscape officer comments May 2022 549KB
- EA Comments 247KB
Officer Report (1)
- Delegated Report 204KB