| General information | |
|---|---|
| Number | P174760/L |
| Current status | Determination Made |
| Decision | Approved with Conditions |
| Appeal decision | |
| Type | Listed Building Consent |
| Location | Land at Stocks House Farm Wellington Herefordshire |
| Proposal | Proposed conversion of grade II listed hay barn to form dwelling. Proposed demolition of redundant farm buildings and erection of 4 no. dwellings. |
| Parish | Wellington - prior 2019 |
| Ward | Queenswood - prior 2019 |
| Easting/Northing | 349548 - 248146 |
| Agent address | Owen Hicks Architecture Second Floor Offices 46 Bridge Street Hereford Herefordshire HR4 9DG |
| Applicant address | GRW PROPERTY The Old Rectory Hope-Under-Dinmore Leominster Herefordshire HR6 0PW |
| Publicity date | Friday 12 January 2018 |
| Comments by | Thursday 8 February 2018 |
| Application dates | |
|---|---|
| Date received | Thursday 21 December 2017 |
| Date validated | Thursday 21 December 2017 |
| Consultation start date | Friday 12 January 2018 |
| Consultation end date | Thursday 8 February 2018 |
| Decision date | Wednesday 11 April 2018 |
| Target determination date | Friday 13 April 2018 |
| Consultees | |
|---|---|
| Consultee | |
| Organisation name | Built and Natural Environment |
| Address | Plough Lane Offices Plough Lane Hereford HR4 0LE |
| Date consulted | 12 January 2018 |
| Consultee | |
| Organisation name | Wellington PC |
| Address | 4 St Margarets Close Wellington Herefordshire HR4 8BF |
| Date consulted | 12 January 2018 |
| Consultee | |
| Organisation name | Casework Assistant |
| Address | Historic England The Axis 10 Holliday Street Birmingham B1 1TG |
| Date consulted | 12 January 2018 |
| Consultee | |
| Organisation name | Queenswood |
| Address | Raven Lodge Tillington Hereford HR4 8LW |
| Date consulted | 12 January 2018 |
| Consultee | |
| Organisation name | National Amenity Societies |
| Address | 37 Spital Square London E1 6DY |
| Date consulted | 12 January 2018 |
| Consultee | |
| Organisation name | Built and Natural Environment |
| Address | Plough Lane Offices Plough Lane Hereford HR4 0LE |
| Date consulted | 16 March 2018 |
Relevant documents
Application Form (1)
- R - App Form 200KB
Decisions (1)
- Decision Notice 122KB
Supporting Documents (9)
- Supporting Letter re: Amended Proposals 15.3.18 2.0MB
- Supporting Statement Appendix B 373KB
- Structural Report 150KB
- Supporting Statement Appendix A 52KB
- Supporting Statement Appendix D 39KB
- Proposed GRW materials.pdf 2.5MB
- Water use calculation units 2 - 5.pdf 76KB
- Water use calculation unit 1.pdf 76KB
- Design & Access Statement 1.8MB
Drawings (31)
- Existing Stone Roadside Wall Re-Building Details 15.3.18 389KB
- AMENDED Floor Plans & Elevations as Proposed: Units 2 - 5 15.3.18 2.9MB
- AMENDED Floor Plans, Elevations & Section as Proposed: Unit 1 15.3.18 2.2MB
- AMENDED Landscaping & Biodiversity Enhancement Plan as Proposed 15.3.18 2.2MB
- AMENDED Barn Conversion Raised Ground Floor/ Wall Detail 15.3.18 142KB
- AMENDED Vehicular Access, Driveway, Parking & Turning Area Specification 15.3.18 2.0MB
- AMENDED Site Plan as Proposed 15.3.18 1.9MB
- Site Location Plan 67KB
- SUPERSEDED Proposed Floor Plans and Elevations Plans 852KB
- Proposed Floor Plans, Elevations, Sections Garage Cycle & Bin Store Plan 105KB
- SUPERSEDED Proposed Floor Plans, Elevations and Plans 339KB
- Existing & Proposed Site Section Plans 342KB
- SUPERSEDED Proposed Vehicular Access, Driveway, Plans 180KB
- SUPERSEDED Proposed Landscaping and Biodiversity Plans 198KB
- SUPERSEDED Proposed Site Plans 184KB
- Proposed Block Plans 58KB
- Existing Site Plans 151KB
- Existing Floor, Elevations & Section Plan 149KB
- Existing Block Plans 52KB
- Demolition Plans Workshop and Machinery Store Plans 53KB
- Proposed Demolition Plans Machinery Plans 51KB
- Proposed GPL Single Recessed Install into Plain TilePlans 691KB
- Proposed New Build (units 2-5) window/ Plans 123KB
- Proposed Barn Conversion Ridge Detail Plans 66KB
- Proposed New Build (units 2-5) eavesPlans 57KB
- Proposed New Build (units 2-5) verge /Plans 39KB
- Proposed Barn Conversion First Floor /Plans 70KB
- Proposed Barn Conversion Window / DoorPlans 55KB
- Proposed New build (units 2-5) Wall Details Plans 53KB
- SUPERSEDED Proposed Barn Conversion Raised GroundPlans 66KB
- Proposed Barn Conversion Verge / Barge Plans 39KB
Correspondence (2)
- Corres with HBO 198KB
- DOC 18.4.18 58KB
Representations (4)
Officer Report (1)
- DelegRpt 386KB