Relief Road Studies
- Title
- Relief Road Studies
- Description
-
This comprises of the following studies:
Multi Modal Model Forecasting Report
This study has modelled the impact of the planned future growth of Hereford on the transportation networks of the city. The study updates the Hereford Transport Review with new survey data and upgraded it to a Multi-Modal Study by including consideration of all forms of transport including public transport, cycling and walking in addition to travel by private car.
Hereford Relief Road - Study of Options
This study reviewed possible corridor options to the east and west of the city and assessed them in relation to their environmental, engineering and traffic impacts. The study also includes additional modelling work to assess the role of sustainable transport in helping support growth.
These are study corridors identified for the purposes of the plan making process and not the precise routes. The forthcoming Hereford Area Plan will define the route of any future Hereford Relief Road.
Delivering a Sustainable Transport System (DaSTS)
The regional DaSTS Growth Point Connectivity considered Hereford's role as a designated Growth Point for future development. Its stated aims were to tackle immediate problems and to shape the transport system to meet longer term challenges. The study considered low-cost, specific and innovative sustainable transport interventions to address the transport issues associated with this growth, including smarter choices and initiatives to influence travel behaviour.
- Documents
-
Relief road studies documents
- Highways Agency confirmation of need for relief road June 2013 (pdf, 305kB)
- Summary report of Core Strategy modelling June 2013 (pdf, 411kB)
- Hereford Local Plan Core Strategy modelling specification April 2013 (pdf, 536kB)
- Hereford base highway model comparison 2012/2008 February 2013 (pdf, 1MB)
- Hereford relief road interim forecasting report addendum: reduced housing and employment option November 2012 (pdf, 6MB)
- Eastern link road impacts study April 2012 (pdf, 1MB)
- Eastern links assessment report November 2012 (pdf, 12MB)
- Independent review of Hereford eastern link study October 2012 (pdf, 196kB)
- Independent review of Hereford relief road studies July 2011 (pdf, 233kB)
- Hereford relief road habitats regulations assessment April 2011 (pdf, 1MB)
- Hereford relief road interim forecasting report revised eastern route options document March 2011 (pdf, 2MB)
- Economic and business impacts Hereford relief road December 2011 (pdf, 5MB)
- Hereford relief road southern corridor assessment report May 2012 part 1 (pdf, 13MB)
- Hereford relief road southern corridor assessment report May 2012 part 2 (pdf, 18MB)
- Hereford relief road southern corridor assessment report May 2012 part 3 (pdf, 13MB)
- Hereford relief road southern corridor assessment report May 2012 part 4 (pdf, 8MB)
- Hereford relief road southern corridor assessment report May 2012 part 5 (pdf, 15MB)
- Relief road - Study of Options documents and maps (, 0b)
Study of Options September 2010 documents and maps
- Study of Options September 2010 (pdf, 9MB)
- Appendix A - Engineering assessment report part 1 (pdf, 7MB)
- Appendix A - Engineering assessment report part 2 (pdf, 15MB)
- Appendix A - Engineering assessment report part 3 (pdf, 13MB)
- Appendix A - Engineering assessment report part 4 (pdf, 11MB)
- Appendix A - Engineering assessment report part 5 (pdf, 11MB)
- Appendix B - Environmental assessment report September 2010 (pdf, 2MB)
- Appendix B - Environmental assessment report appendix part 1 (pdf, 16MB)
- Appendix B - Environmental assessment report appendix part 2 (pdf, 2MB)
- Appendix B - Environmental assessment report appendix part 3 (pdf, 15MB)
- Appendix C - Sustainable options package September 2010 (pdf, 4MB)
- Stage 1 - Assessment report August 2010 (pdf, 14MB)
- Draft Study of Options August 2010 (pdf, 11MB)
- 1 Study of Options September 2010 Link SC1 Map 1 - Link SC2 Map 2 (pdf, 16MB)
- 2 Study of Options September 2010 Link WL1 Map 3 (pdf, 13MB)
- 3 Study of Options September 2010 Link WL2 Map 4 (pdf, 13MB)
- 4 Study of Options September 2010 Link WL3 Map 5 (pdf, 14MB)
- 5 Study of Options September 2010 Link WL4 Map 6 (pdf, 14MB)
- 6 Study of Options September 2010 Link WL5 Map 7 (pdf, 12MB)
- 7 Study of Options September 2010 Link WL6 Map 8 (pdf, 12MB)
- 8 Study of Options September 2010 Link WL7 Map 9 (pdf, 11MB)
- 9 Study of Options September 2010 Link WL8 Map 10 and WL9 Map 11 (pdf, 12MB)
- 10 Study of Options September 2010 Link WL10 Map 12 (pdf, 11MB)
- 11 Study of Options September 2010 Link WL11 Map 13 and WL12 Map 14 (pdf, 10MB)
- 12 Study of Options September 2010 Link WL13 Map 15 (pdf, 10MB)
- 13 Study of Options September 2010 Link WL14 Map 16 (pdf, 10MB)
- 14 Study of Options September 2010 Link NC1 Map 17 and Link NC2 Map 18 (pdf, 15MB)
- 15 Study of Options September 2010 Link NC3 Map 19 and Link NC4 Map 20 (pdf, 15MB)
- 16 Study of Options September 2010 Link EL1 Map 21 and Link EL2 Map 22 (pdf, 16MB)
- 17 Study of Options September 2010 Link EL3 Map 23 (pdf, 8MB)
- 18 Study of Options September 2010 Link EL4 Map 24 and Link EL5 Map 25 (pdf, 15MB)
- 19 Study of Options September 2010 Link EL6 Map 26 and Link EL7 Map 27 (pdf, 15MB)
- 20 Study of Options September 2010 Link EL8 Map 28 and Link EL9 Map 29 (pdf, 15MB)
- 21 Study of Options September 2010 Link EL10 Map 30 and Link EL11 Map 31 and Link EL12 Map 32 (pdf, 14MB)
DaSTS regional study documents